Great day at work; started day with synchronization among
team member i.e. to bring everyone on same page in terms of our SOW, deliverables, check points and final presentation etc
Actual work started after synchronization work where I have
to lead conversation with Director of Administration and Finance for the
requirement gathering. The most exciting part of the story is that she hardy
understands English and I hardly understand French. Patrick, he is from France,
has to do the translations for both of us. I really sympathize him since he has
to do double work of a team member and a translator. Most beautiful part him
being translator is that he does the translation with context instead of purely
linguistic translation. Most of the other teams are struggling with those
translators
Requirement gathering session
Requirement Gathering Session |
Requirement |
I think that is the beauty of philosophy behind CSC program.
Challenge yourself to work environments where you have cultural, linguistic and
other barriers. I am loving it
Complete 1/3 of the requirement gathering during pre-lunch
session, waiting for post lunch session. It is going to be tough since post
lunch session for me always like siesta time. God have mercy on me
Team is working sincerely post lunch
Sincere Team members |
Other 2 friends on team are busy in designing database
solution for various KPI’s and statistical reporting. Gerry goes “first time in
my life I am doing data modeling on small pieces of paper” basic creativity
always rocks.
I missed to take picture how we secured these papers, will try to get and
post tomorrow…
#ibmcsc, #ibmcscmorocco5
Thanks Ram - I share your poste on my FB !
ReplyDelete